Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

SDC got fundet

📸 Introduction to the SDC Team

The tasks at the start of SDC are manifold. They range from establishing standards and policies, curating and injecting data from the OT and other sources, setting up the necessary IT infrastructure, to creating a new project plan in record time.

As of January 2021, this challenge is being met by twelve members with overlapping responsibilities and expertise (at least two more engineers are expected to join in the course of the year).

Strategic decisions are taken by the board, consisting of Svetlana Berdyugina. as PI, Petri Kehusmaa for management & project planning, Nazaret Bello Gonzales leading the scientific efforts in SDC, and Peter Caligari as overall project head & responsible for IT.

Name (% FTE in SDC)

Responsibility

Svetlana Berdyugina (10%)

Status
colourGreen
titleBoard
Status
colourYellow
titleScience

Project PI, internal & external collaborations, high-level data

Janek Beck (100%)

Status
colourRed
titledevops

IT specialist trainee, application and pipeline development

Nazaret Bello Gonzalez (50%)

Status
colourGreen
titleBoard
Status
colourYellow
titleScience
Status
colourPurple
titleData

Project Lead Scientist, data calibration, curation & dissemination, high-level data, internal and external scientific collaborations, workshops and training events

Peter Caligari (80%)

Status
colourGreen
titleBoard
Status
colourBlue
titleIT
Status
titleTechnology

Project head, technology development and realisation, compute & data infrastructure, network, budget & personnell responsibility, head of IT

Vigeesh Gangadharan (60%)

Status
colourYellow
titleScience
Status
colourPurple
titleData
Status
colourRed
titledevops

high-level data tools development

Andriy Gorobets (50%)

Status
colourYellow
titleScience
Status
colourPurple
titleData
Status
colourRed
titledevops

Data curation & analysis, high level data development

Marco Günter (20%)

Status
colourBlue
titleIT
Status
titleTechnology
Status
colourRed
titledevops

System IT, compute, infrastructure and data servers, network,

Petri Kehusmaa (100%)

Status
colourGreen
titleBoard
Status
titleTechnology

Project manager & senior systems architect, project plan development, governance, risk assessment

Markus Knobloch (40%)

Status
colourBlue
titleIT
Status
colourPurple
titleData

Status
colourRed
titledevops

OT interfaces and data injection (hardware side), meta-data standards, non-scientific IT, instructor for trainees

Sophie Müller (100%)

Status
colourRed
titledevops

IT specialist trainee, application and pipeline development

Carl Schaffer (100%)

Status
colourPurple
titleData
Status
titleTechnology
Status
colourRed
titledevops

System architect, lead software developer, OT data injection (software side), ML, AI, Web-applications

Taras Yakobchuk (50%)

Status
colourYellow
titleScience
Status
colourPurple
titleData
Status
titleTechnology
Status
colourRed
titledevops

System architect, high level data & data management

SDC Project Status 02-2021

Include PageSP:SDC Project Status 02-2021

SP:

SDC Project Status 02-2021


SDC Project kick-off was held on October 2020. Since then we have come a long way. We have had workshop with scientists to gather requirements for this new service platform. We have also tested a lot of different technology options to be selected as building block for the future infrastructure.

Now we have entered the Solution Analysis and Design phase. In this phase we will work with different conceptual design components to be selected into our final blueprint and to be further implemented later this year.

The project team has also deployed Jira Atlassian for Service Management and Documentation. Jira Service Management will in the future serve SDC as “Help Desk” ticketing system and knowledge base for platform users. It will provide automated workflows, support portal, knowledge base, feedback system and many more new services for the community.

Solution Analysis and Design Phase steps.

Drawio
zoom1
simple0
inComment0
pageId134775845
custContentId135038077
lbox1
diagramDisplayNameUntitled Diagram.drawio
contentVer3
revision3
baseUrlhttps://leibniz-kis.atlassian.net/wiki
diagramNameUntitled Diagram.drawio
pCenter0
width1241
links
tbstyle
height438

📋 Summary

Current project health

Current project status

Project constraints

Status
colourGreen
titleGreen

Solution Analysis and Design in progress.

Project is slightly behind the schedule.

Resources.

Technology POCs taking more time than predicted.

📊 Project status

Tip

Accomplishments

  • Workshop

  • Technology POCs

  • Requirements validation

  • Jira Atlassian deployment for project team

Next steps

  • Solution Analysis and Design

  • Define data policies

  • Define embargo rules

Warning

Risks & project issues

  • Lack of resources


🖥 IT news


Network

Dedicatel 10 Gbit line between KIS & OT

We are currently setting up a dedicated 10 Gbit line between the OT and the KIS (technically, we get a wavelength in a multiplexed dark-fibre, a so-called Lambda).

On Spanish territory, the line is completely free of charge. Nevertheless, the (throughput independent) annual costs for the remaining distance amount to approx. 45 k€ (incl. VAT). Additionally, there are one-time set-up costs of about 30 k€. The costs are

We expect a significantly lower latency on the new line than on the existing internet connection (which will not be affected in any way).
Therefore, we will mainly use it for remote observations and data transport within the framework of the SDC.

The SDC is striving for cooperation with the SCC/KIT in Karlsruhe. By coincidence, the 10 Gbit line enters German territory at the DFN node in Campus North of the KIT. We hope to connect KIT and KIS using the same line without significantly higher costs (despite the high expected load).

New (application) firewalls at KIS & OT

Tip

Highlights


👋 About me


📎 References

Strategy & OKRs